RAMPby Tailcontrol Start free trial

Ops, CAMO and finance for your aircraft, in one place.

For operators and owners of one to ten aircraft. The dispatch desk, the maintenance records and the invoices share one record, so a flight is only booked when the aircraft can fly it.

No card needed for the trial. Your own company space is ready in a few minutes.

Ramp home screen: next departure, dispatch readiness, flights in the next seven days, receivables and block hours

Built for the people who keep a few aircraft flying.

Small operators often run on a booking tool, a maintenance spreadsheet and an accounting program that never talk to each other. Ramp puts them together.

Operations sees the hours left before the next inspection while planning. Maintenance sees every booked leg. Finance invoices the trip that was actually flown.

Flight operations

Plan, quote and dispatch

A schedule by aircraft and crew, quotes priced from your own cost model, and a readiness check before every departure.

  • Conflicts and missing permissions flagged before they cost a slot
  • Crew duty and rest checks
  • Handling and permit requests by e-mail
Schedule of two aircraft over fourteen days with conflicts listed below
Maintenance and CAMO

Every limit, every aircraft

Due list and forecast, AD and SB tracking, components, defects and MEL, work orders and the flight log, included in every plan.

  • Next inspection by hours, landings and date
  • Import an existing aircraft file
  • A check before dispatch when something is still open
Maintenance overview of an aircraft with status, hours and open work orders
Safety and compliance

A safety management system that is actually used

Occurrence reports, a risk register, audits and changes, following the rules of the state your aircraft is registered in.

  • Reports in the ECCAIRS taxonomy
  • Findings with owners and due dates
Safety and compliance overview with occurrences, risk register and audits
Finance

Invoices, receipts and owner statements

Invoice a trip in two clicks, follow what is overdue and send owners a clear monthly statement. Your accountant gets their own access.

  • Debit and credit notes, receipts
  • Receivables ageing
  • Bookkeeping with bank and card statement import
Finance screen with invoiced, received and outstanding totals and a list of invoices
Links for people outside the office

Pilots, owners, brokers and clients see only their part

A phone app for pilots with their duties and documents, a page for aircraft owners and partners, a broker portal and a quote link for clients. Messages arrive on WhatsApp or by e-mail.

Assistant

Ask the system, in your language

A built-in assistant reads your manuals and data, explains a screen step by step and drafts e-mails and lists for you to check. It never signs or approves anything. Ramp works in English, Italian, Russian and Hebrew.

One aircraft. One record.

When a trip is planned, Ramp checks it against the maintenance limits, the crew and the airport permissions at once. You see the reason before the flight is sold, not after the aircraft is grounded.

Schedule with the conflicts and checks for every planned flight

Up and running in an afternoon.

1

Create your company

Sign up with your e-mail and confirm it. You get your own company space, separate from every other customer.

2

Add your aircraft

A short set-up asks for the company details, the first aircraft and its hours. Import an existing aircraft file if you have one.

3

Invite your team

Operations, maintenance, the accountant and the pilots each get an invitation and see what their role needs.

Priced per aircraft. Every user included.

Up to 3 aircraft€750 per monthFlat price for the whole company, any number of users.
4 to 10 aircraft+€150 per extra aircraftAdded to the €750 base, per aircraft per month.
More than 10 aircraftLet's talkLarger fleets, and CAMOs that look after many owners' aircraft.
Set-up€1,500 onceCompany set-up and import of your aircraft data.
  • Maintenance and CAMO in every plan
  • The assistant, within fair use
  • Two months free when you pay yearly
  • 30-day free trial, no card needed
  • Support by e-mail and in-app chat, Monday to Friday 09:00–18:00 CET
  • Reply within one business day, within 4 hours when the system is down

Prices exclude VAT.

Your data stays yours.

Hosted in Europe

The database and files are kept in Western Europe, with an encrypted copy made every night in a separate data centre in the EU.

Each company on its own

Every customer's records are kept apart from every other customer's, on the server and on each device.

Two-step sign-in

Administrators can require a code from an authenticator app for everyone in the company. Recovery codes cover a lost phone.

Take it with you

Download a full backup of your company at any time, in an open format.

Try it with your own aircraft for 30 days.